Gypsum Exploration And Mining Method

The gypsum mining project was placed on care and maintenance following its closure in 2008, however, dampier salt limited has once again decided to re-start mining gypsum at the lake macleod salt mine.Mining of gypsum is to carried out on a campaign basis with a production target of 500,000 tonnes of gypsum.