Mining Concentrator

The east boulder concentrator has a design capacity of 1,800 tonnes per day and currently operates at an 91 utilisation rate.Currently, at the stillwater mine 55 and at the east boulder mine 50 of mill tailings go back underground for backfill.The remaining tailings are piped to tailings storage facilities adjacent to each mine.